GREENVILLE, SC--(Marketwire - March 10, 2010) - Waste2Energy Holdings, Inc. (W2e) (PINKSHEETS: WTEZ), a worldwide waste-to-energy company, announced that it has received an order for preliminary engineering and layout design from Terra Navita Inc., its regional distributor, for a 300 metric ton per day waste-to-energy facility on the Caribbean island of Sint Maarten. In a previously released communication, W2e announced that it had received a letter of intent from Terra Navita for this same project. This order will facilitate a fast start to the project once the contractual details have been finalized.
Read »Waste2Energy Receives Order to Begin Design of 300 Metric Ton per Day Waste-to-Energy Facility in Sint Maarten
http://www.marketwire.com –
Recent blog posts
- World of Warcraft Faster Leveling Tips for alliance
- Buy Wow Gold Without Getting Your Account Banned
- Choices Ed hardy Clothing
- Tips To Get Your Ex Girlfriend Back: Win Her Back
- Choosing a Great Local Daycare
- Best Time To Visit Golden Triangle
- Dog Diabetes: Is Your Dog a Candidate for Diabetes?
- Top dog on and off the Racetrack
- High Blood Pressure Medications
- Do You Get Auto Glass So Clear the Windows Look Like Their Gone?
Best published scoops - San Jose
Tags in Category
Tags in Tags
Who's online
There are currently 0 users and 9 guests online.


